DYD B-11
WnsDHHvyCDGBoHeKxr 119
A pension scheme http://fittor.top/xfantasy-elles/ xxxxxxxxxxxxxxxxxcom  Under the more pessimistic Scenario A, the adequacy levelwould turn negative by 2020 (by 7 gigawatts compared with atotal installed capacity of 1,092 GW), which meant that extrageneration would be needed. (Chart 2)
Moses 2020-03-31 05:47:15

ȸ»ç¼Ò°³ | ã¾Æ¿À½Ã´Â ±æ | ÀÎÁõ³»¿ëº¸±â