(5) ¿ÍÀÎÀå ¿ù³Ó
BMoxnuPDdBmHLWkubFr 188
Could I make an appointment to see ? http://apetube.in.net/ apetube/  Norton compares it to the Thames desalination plant, which converts salt water into drinking water. The cost of that is £300m and provides 150 megalitres of water a day. Another snag is the timing. Without HS2, he estimates it would take 15 years to build. With it, even though the land-clearing work would have been done, the water project would be delayed by the building of the rail track. The line between London and Birmingham won't even be completed until 2026. He predicts the water scarcity problem would need to be solved long before that.
Herbert 2019-08-02 03:35:53

ȸ»ç¼Ò°³ | ã¾Æ¿À½Ã´Â ±æ | ÀÎÁõ³»¿ëº¸±â